NEW QUESTION # 74
Scenario
Additional Information
Product Description

Quality notes from the Daily Log
The Director of Information Technology Division (DIT) has been asked to ensure that any changes to the outsourced staff employment contracts adhere to employment law. The DIT will review future job descriptions of the transferred staff before the final contract is signed with the selected service provider.
The service level agreement between MFH and the selected service provider will specify the type and quality of service required. The selected service provider must follow the industry standards for providing outsourced services.
MFH has a quality management system which contains a document control procedure for all its documentation, however this does not include change management.
All project documents will be subject to a quality review. Nominated products will require a formal approval record signed-off by the quality review chair.
Extract from the draft Quality Management Strategy (may contain errors) Introduction
1. This document defines the approach to be taken to achieve the required quality levels during the project.
2. The Project Board will have overall responsibility for the Quality Management Strategy.
3. Project Assurance will provide assurance on the implementation of the Quality Management Strategy.
Quality management procedure - Quality standards
4. The selected service provider will operate to industry standards for providing outsourced services.
5. MFH document standards will be used.
Records
6. A Quality Register will be maintained to record the planned quality events and the actual results from the quality activities.
7. Configuration Item Records will be maintained for each product to describe its status, version and variant.
8. Approval records for products that require them will be stored in the quality database.
Roles and responsibilities
9. The DIT will check that the employment contracts for outsourced staff adhere to employment law.
10. Team Managers will provide details of quality checks that have been carried out.
11. Team Managers will ensure that the Quality Register is updated with the names of team members who are involved in the review process.
12. The Senior User will review the Product Descriptions of the products to be produced by the selected service provider to ensure that they can be achieved.
Which is a correctly defined acceptance criterion for the transferred facilities computer system?

  • A. No (zero) loss of system functionality.
  • B. Must be subject to regular back-ups.
  • C. Planned periods of shutdowns of the computer system must be kept to a minimum.
  • D. Back-up of data must be kept until the data is no longer needed.

Answer: A


NEW QUESTION # 75
The project is using PRINCE2's recommended risk management procedure. In the 'identify' step, a risk was recorded in the risk register: ''If the 'accredited classroom-based course' is delayed, there is a threat that work on the 'e-learning course' will be delayed, resulting in the 'accredited e-learning course' not being ready for the
'pilot courses'.''
In the 'implement' step, a risk response was decided: ''Work will start incrementally on the 'e-learning course' whenever a part of the 'classroom-based training materials' gains accreditation''.
Is this appropriate, and why?

  • A. Yes, because a risk response needs to be implemented for this major threat.
  • B. Yes, because delivering incrementally will reduce the impact of the threat.
  • C. No, because risks responses should be identified as part of the 'plan' step.
  • D. No, because a risk action should be allocated to implement a response.

Answer: A


NEW QUESTION # 76
Which of the following statements is true of the business interest on the project?

  • A. Ensures the project provides value for money
  • B. Ensures the requirements for the project are defined
  • C. Represents the users of the product
  • D. Ensures the products produced meet the desired quality

Answer: A


NEW QUESTION # 77
Which statement is an appropriate entry for the Initiation Stage Plan?

  • A. The initial project cost estimate of E2.5m, will have a tolerance of +E125k J*E75k.
  • B. The Daily Log has been updated with the new risks which were identified while preparing the Initiation Stage Plan.
  • C. The plan is based on the external outsourcing consultants being available at the start of the initiation stage.
  • D. The project management team will consist of representatives from the IT and Facilities Divisions.

Answer: C

Explanation:
Explanation


NEW QUESTION # 78
HOTSPOT
Extract from the Project Product Description (with errors)

Column 1 is a list of objectives. For each objective in Column 1, select from Column 2 the quality activity that addresses it. Each selection from Column 2 can be used once, more than once or not at all. Drop down the right answer.

Answer:

Explanation:


NEW QUESTION # 79
Scenario
Additional Information

Further information on some resources who could be involved in the project:
Outcome Account Manager: He represents Outcome which is a recruitment agency that provides specialist outsourcing resources. Outcome provided the consultants who carried out the feasibility study and the same consultants will be providing support and guidance to the Information Technology and Facilities teams during the project.
Director of Finance Division: She was transferred from the Information Technology Division 12 months ago. She is responsible for ensuring a cost-conscious approach is adopted in all operational and project activities across the Ministry of Food Hygiene.
Hardware Manager: Reports to the Director of Information Technology. He provides computer hardware to all business functions but has little awareness of the needs of his colleagues working in software.
Payroll Manager: Reports to the Director of Finance. He is a very experienced and efficient qualified accountant who has much of the responsibility of running the Finance Division on behalf of the Director of Finance. He has been involved in drafting the Ministry's business strategy and assisting in a full business risk assessment. He also drafted the corporate Business Case standards.
Which 2 alternative actions apply to the proposed Senior User for this project?

  • A. Retain because he will be providing support to the Information Technology and Facilities teams during the project.
  • B. Add 'Hardware Manager' because he provides computer hardware to all business functions and will be impacted by the outcome.
  • C. Retain because he provides the outsourcing resources required to support the project.
  • D. Remove because he has no authority to commit user resources.
  • E. Replace with 'Director of Research and Development' because she deals with both the Information Technology and the Facilities Divisions and can make sure her division's needs are specified.

Answer: D,E


NEW QUESTION # 80
Which management product do the Project Board use to decide whether to authorize initiation?

  • A. Project Initiation Documentation
  • B. Business Case
  • C. Project Product Description
  • D. Project Brief

Answer: D


NEW QUESTION # 81
Towards the end of stage 2, the stage 3 plan is being prepared. This includes the work required to promote the
new courses to other training companies. In addition to the current ways of marketing the courses, the Sales
Director wants to advertise in trade magazines. The likely costs involved and the opportunities it may bring
have been identified.
As part of the 'update the project plan' activity, what should the project manager be responsible for?

  • A. Recording the effect of implementing the magazine advertisements on the overall time and cost of the
    project.
  • B. Recording changes to ABC Company risk appetite as a result of using the magazine advertisements.
  • C. Creating the product description, with detailed quality criteria, for the magazine advertisements.
  • D. Creating time and cost tolerances for the delivery of the magazine advertisements.

Answer: D


NEW QUESTION # 82
What additional risk will this place on the project?

  • A. These changes will delay stage 3 by three weeks.
  • B. The reduced value of the contracted services required by the Outsourcing project may result in an insufficient number of proposals being received.
  • C. None because risks associated with the centralization and rationalization of the Facilities Division will be managed by another project.
  • D. There is only E70k left in the project change budget.

Answer: C


NEW QUESTION # 83
Project Scenario - Health and Safety Training Project:
ABC Company is a well-established training company that uses a standard model to develop training materials and deliver courses to customers.
ABC Company has commissioned a project in response to recent changes in government legislation relating to health and safety on construction sites. The project will deliver "capability to provide health and safety training", including the materials needed for classroom-based training and e-learning. The expected benefits for construction companies include a reduction in lost days and legal costs due to accidents.
The e-learning course will be developed by a specialist external consultancy. The materials for classroom- based training will be delivered by ABC Company's development team. All course materials will be piloted before they are used. ABC Company will deliver training to its customers and also hopes to sell the course materials to other training companies as part of their operational business. ABC Company will use their own sales and marketing departments to promote the courses.
The legislation requires construction companies to comply with the new legislation within two years. The course materials and trainers have to be accredited by a government agency before courses can be delivered.
ABC Company is planning to deliver pilot courses within five months of starting the project.
The ABC Company standard development model for new courses recommends the following stages:

End of the Project scenario.
Additional Information:
The Chief Executive Officer (CEO) founded the company five years ago. Under her leadership, ABC Company has grown quickly into a successful training company. It delivers a range of accredited professional training.
The Finance Director is also a founder member of ABC Company and is responsible for authorizing budgets for the Operations and Development Teams. She authorizes all large contracts personally.
The Purchasing Manager reports to the Finance Director and is responsible for managing and monitoring supplier contracts.
The Operations Director is responsible for the delivery off all training and for the training development budget. His department organizes courses, venues and trainers. They work with the Product and the Sales teams to provide a comprehensive training schedule. ABC Company's IT manager reports to the Operations Director.
The Business Development Director has recently been appointed to identify new training needs and propose new products. She will work with the Operations. Director to ensure a cost-conscious approach and that appropriate development technologies are used for the health and safety course.
The Training Development Manager reports to the Business Development Director and is responsible for developing training materials and gaining accreditation, in accordance with the standard course development model. Course developers in his team have skills in a range of development technologies and are allocated to projects as needed.
The Training Delivery Manager, who reports to the Operations Director, is responsible for ensuring that internal and external trainers deliver ABC Company training courses to the required standard. He also checks course materials to ensure they are fit for purpose and of the required quality.
The Central Services Director has responsibility for corporate communications, facilities management and configuration management. He recently led a project to consolidate all company quality systems into one quality management system and set up a corporate quality department, now managed by the Corporate Quality Manager.
The Corporate Document Manager reports to the Central Services Director. She helped establish the company' s document management system and now operates it across the business. She manages a team of administrators and contracts staff when workload is high.
The Sales Director joined ABC Company two months ago and is keen to establish himself by suggesting new markets for the courses and material. All account managers and the marketing team report to him. They promote existing training courses to other training companies and existing customers.
End of the additional information.
The Training Delivery Manager was identified as the senior user. However, before the project begins, this manager goes on long-term sick leave. The executive says that they do not need to replace the role of senior user on the project board.
Is this an appropriate application of the 'defined roles and responsibilities' principle, and why?

  • A. Yes, because the executive can ensure that the investment provides value for money.
  • B. Yes, because having two out of three of the stakeholder interests represented on the project board is enough.
  • C. No, because the resources and expertise required by the project may be internal or external.
  • D. No, because trainers need to be represented on the project board to ensure the outcomes meet the trainers' needs.

Answer: B

Explanation:
Reference
http://prince2.wiki/Define_roles_and_responsibilities


NEW QUESTION # 84
Project Scenario - Health and Safety Training Project:
ABC Company is a well-established training company that uses a standard model to develop training materials and deliver courses to customers.
ABC Company has commissioned a project in response to recent changes in government legislation relating to health and safety on construction sites. The project will deliver "capability to provide health and safety training", including the materials needed for classroom-based training and e-learning. The expected benefits for construction companies include a reduction in lost days and legal costs due to accidents.
The e-learning course will be developed by a specialist external consultancy. The materials for classroom- based training will be delivered by ABC Company's development team. All course materials will be piloted before they are used. ABC Company will deliver training to its customers and also hopes to sell the course materials to other training companies as part of their operational business. ABC Company will use their own sales and marketing departments to promote the courses.
The legislation requires construction companies to comply with the new legislation within two years. The course materials and trainers have to be accredited by a government agency before courses can be delivered.
ABC Company is planning to deliver pilot courses within five months of starting the project.
The ABC Company standard development model for new courses recommends the following stages:

End of the Project scenario.
Additional Information:
The Chief Executive Officer (CEO) founded the company five years ago. Under her leadership, ABC Company has grown quickly into a successful training company. It delivers a range of accredited professional training.
The Finance Director is also a founder member of ABC Company and is responsible for authorizing budgets for the Operations and Development Teams. She authorizes all large contracts personally.
The Purchasing Manager reports to the Finance Director and is responsible for managing and monitoring supplier contracts.
The Operations Director is responsible for the delivery off all training and for the training development budget. His department organizes courses, venues and trainers. They work with the Product and the Sales teams to provide a comprehensive training schedule. ABC Company's IT manager reports to the Operations Director.
The Business Development Director has recently been appointed to identify new training needs and propose new products. She will work with the Operations. Director to ensure a cost-conscious approach and that appropriate development technologies are used for the health and safety course.
The Training Development Manager reports to the Business Development Director and is responsible for developing training materials and gaining accreditation, in accordance with the standard course development model. Course developers in his team have skills in a range of development technologies and are allocated to projects as needed.
The Training Delivery Manager, who reports to the Operations Director, is responsible for ensuring that internal and external trainers deliver ABC Company training courses to the required standard. He also checks course materials to ensure they are fit for purpose and of the required quality.
The Central Services Director has responsibility for corporate communications, facilities management and configuration management. He recently led a project to consolidate all company quality systems into one quality management system and set up a corporate quality department, now managed by the Corporate Quality Manager.
The Corporate Document Manager reports to the Central Services Director. She helped establish the company' s document management system and now operates it across the business. She manages a team of administrators and contracts staff when workload is high.
The Sales Director joined ABC Company two months ago and is keen to establish himself by suggesting new markets for the courses and material. All account managers and the marketing team report to him. They promote existing training courses to other training companies and existing customers.
End of the additional information.
PLANS
Here are three events to managing plans for the project.
In which management product (A-E) should the result of each event be recorded?
Choose only one product for each event. Each product can be used once, more than once or not at all.

Answer:

Explanation:

Explanation:


NEW QUESTION # 85
Who is responsible for confirming stage and project progress against agreed tolerances?

  • A. Executive
  • B. Project Support
  • C. Project Assurance
  • D. Project Manager

Answer: C


NEW QUESTION # 86
Which of the following is False?
A Successful project management team should.

  • A. Have an effective strategy to manage communication flows to and from stakeholders
  • B. Never be reviewed as members should stay with the team for the duration
  • C. Have business, user and supplier stakeholder representation
  • D. Ensure appropriate governance by defining responsibilities for directing, managing and delivering the
    project and clearly defining accountability at all levels

Answer: B


NEW QUESTION # 87
Using the Project Scenario and the Extract from Stage Plan for stage 3 provided as additional intonation for this question in the Scenario Booklet, answer the following 5 questions.
The Stage Plan for stage 3 has been produced.
The Engineering Manager insists that there are to be no interruptions to operations whilst photographs are being taken of the engineering staff performing their everyday duties and operating machinery. Two weeks ago the professional photographer produced the photo session schedule based on the operational staff schedule. The operational staff schedule is produced weekly and maintained by the Engineering Manager.
None of the £500 change budget has been used to date and this is available for the stage.
Which 2 statements apply to the External dependencies section?

  • A. Move entry 5 to Plan description because the new company logo will be delivered during stage 3.
  • B. Delete entry 7 because it should be shown in the Product Description for the label design.
  • C. Move entry 5 to Plan prerequisites because the new company logo will influence the label designs.
  • D. Delete entry 6 because the customer details were used in stage 2 to create the customer list.
  • E. Delete entry 5 because the new company logo is being delivered by a separate project and will be detailed in the plans for that project.

Answer: B,D


NEW QUESTION # 88
During stage 3, the operational staff that handle course bookings asked for the project scope to be increased for an online booking function. The additional product has been as it will enable them to process bookings more quickly and accurately.
Is this an appropriate application of the 'focus on products' principle, and why?

  • A. No, because there needs to be an understanding of the products from the start of the project.
  • B. Yes, because the goal is to seek opportunities to implement improvements after the life of the project.
  • C. No, because existing product descriptions provide a means to estimate effort to planning.
  • D. Yes, because the project needs to fulfill stakeholder expectations by delivering the products required.

Answer: D

Explanation:
Explanation/Reference:
Testlet 1
Scenario
Additional Information
During the initiation stage the Project Manager met with the Marketing Director to find out more about the requirements of the promotional calendar and recorded the following notes:
There has been a reduction in the order numbers at the MNO Manufacturing due in part to the increased marketing activities of its competitors. 10% of customers have not re-ordered in this financial year and staff morale is poor. A number of skilled staff have left as a result and replacement staff have not been recruited due to the reduced operation. If the project is successful, a recruitment campaign will be required to fill the existing staff vacancies and there may be a requirement for additional staff. Operational costs are likely to increase because skilled staff are expensive and difficult to find.
In financial terms, there were a total of 1,500 orders in the last financial year, each with an average profit of
£2k. The Marketing department believes that sending a promotional calendar to our current and prospective customers would increase orders by at least 10% with a minimum of 10 further orders from the list of prospective customers within 12 months from the date of distribution.
The Marketing Director will be funding the project from the business marketing budget. She believes that the effect of a good company image portrayed by a successful calendar would last into a second year. She has forecast the same increase in orders for a second year and predicts that the annual employee satisfaction survey will show a measurable improvement in staff morale.
A number of alternatives were explored, including:
20% discount for all repeat customers - not cost-effective and very short term

A promotional calendar as a free Christmas gift - would target current and prospective customers and

the benefits would last into a second year
A series of television and press advertisements was too expensive

A direct mail shot to all customers - benefit would be short term

Creation of an internet website - would not suit all customers

The calendar is seen as the favored option, as long as the company's competitors do not increase their marketing activity. Whilst the Marketing department wants a very high quality, glossy product, the project management team must be aware of the cost this will incur.
Using the Project Scenario and the additional Information provided for this question In the Scenario Booklet, answer the following question.


NEW QUESTION # 89
Scenario
Additional Information
Extract from the Communication Management Strategy.
The project information in the table below is true, but it may not be recorded under the correct heading or be in the correct document.

Using the Project Scenario, select the appropriate response to each of the following 5 questions which have been raised by the Project Board.
The project is now at the end of the initiation stage. Having decided that the Calendar project is a relatively simple project, the Project Manager combined the Starting Up a Project process and the Initiating a Project process. No Project Brief has been produced. Instead the Project Manager used the project mandate to produce a simple Project Initiation Documentation (PlO). The PlO includes the Business Case, a product checklist and several Product Descriptions, Including the Project Product Description. Short sections are also included for each of the strategies and the controls to be applied. The Project Manager has elected to use the Daily Log to record all risks, issues. lessons and quality - results.
After the initiation stage there will be two further stages during which a small number of Work Packages will be authorized. While these are being managed, the Project Manager will hold regular checkpoints, which will support the production of weekly Highlight Reports to the Project Board.
There is no Project Brief. How can there be a common understanding of the desired outcomes for the prepared calendar pack?

  • A. The Project Brief should have been produced and approved before the project progressed into the initiation stage.
  • B. The simple Project Initiation Documentation contains the project definition.
  • C. The simple Project Initiation Documentation contains the Quality Management Strategy. This contains details of the acceptance criteria for this project.

Answer: B


NEW QUESTION # 90
Who is responsible for confirming stage and project progress against agreed tolerances?

  • A. Executive
  • B. Project Support
  • C. Project Assurance
  • D. Project Manager

Answer: C


NEW QUESTION # 91
Which 2 statements explain why the Marketing Director should be appointed as a Senior User for this project?

  • A. The Marketing department will help to deliver the benefits of this project.
  • B. She previously had a successful career in publicity.
  • C. A number of the products will be produced by the Sales department and the Marketing department.
  • D. The project will be funded from the business marketing budget.
  • E. She can represent the Marketing department.

Answer: A,E


NEW QUESTION # 92
The shopping centre is now open. The Business Opportunities Director is concerned that the new shopping centre has not resulted in the expected increase in opportunities for businesses. The Director has asked for research to identify whether more opportunities exist and whether more new businesses have started in LouisTown as a direct result of the project.
Which principle is being applied by the Director, and why?

  • A. Manage by exception, because the senior user's forecast that the benefits tolerance will be breached should be escalated
  • B. Ensure continued business justification, because the project executive should ensure the expected benefits are realized as a result of the project
  • C. Manage by exception, because the project board should decide whether more work is needed to achieve the benefit
  • D. Ensure continued business justification, because there should be checks to ensure that the benefits have been achieved after the project has closed

Answer: D

Explanation:
PRINCE2 requires that a project must have continued business justification throughout its life and beyond closure. The business case is not limited to delivery of outputs; it explicitly focuses on whether benefits are realized after the project is complete. PRINCE2 states that "the business case is used to assess whether the project remains viable, desirable, and achievable" and that benefits may be realized during or after the project.
The scenario describes the project as already closed ("the shopping centre is now open"), yet the Business Opportunities Director is commissioning research to determine whether the expected benefits have been achieved. This aligns precisely with PRINCE2 guidance that post-project reviews and benefits reviews are required to confirm whether the business case assumptions were correct.
Option A is correct because it reflects PRINCE2's requirement that benefits realization must be checked after project closure, typically through the Benefits Management Approach and post-project reviews. Option B is incorrect because benefit realization is not solely the responsibility of the project executive once the project has closed. Options C and D incorrectly apply the manage by exception principle, which relates to tolerances during delivery, not post-project benefit assessment.


NEW QUESTION # 93
Which statement is TRUE with regard to technical stages?

  • A. Technical stages can only occur sequential
  • B. Technical stages define the commitment of resources and authority to spend
  • C. Technical stages often overlap
  • D. Technical stages define where management decisions are appropriate

Answer: C

Explanation:
Explanation/Reference:
Starting up and Initiating a Project
Testlet 1
Scenario
Additional Information
Extract from the Communication Management Strategy.
The project information in the table below is true, but it may not be recorded under the correct heading or be in the correct document.

Using the Project Scenario, select the appropriate response to each of the following 5 questions which have been raised by the Project Board.
The project is now at the end of the initiation stage. Having decided that the Calendar project is a relatively simple project, the Project Manager combined the Starting Up a Project process and the Initiating a Project process. No Project Brief has been produced. Instead the Project Manager used the project mandate to produce a simple Project Initiation Documentation (PlO). The PlO includes the Business Case, a product checklist and several Product Descriptions, Including the Project Product Description. Short sections are also included for each of the strategies and the controls to be applied. The Project Manager has elected to use the Daily Log to record all risks, issues. lessons and quality - results.
After the initiation stage there will be two further stages during which a small number of Work Packages will be authorized. While these are being managed, the Project Manager will hold regular checkpoints, which will support the production of weekly Highlight Reports to the Project Board.


NEW QUESTION # 94
Project Scenario - Health and Safety Training Project:
ABC Company is a well-established training company that uses a standard model to develop training materials and deliver courses to customers.
ABC Company has commissioned a project in response to recent changes in government legislation relating to health and safety on construction sites. The project will deliver "capability to provide health and safety training", including the materials needed for classroom-based training and e-learning. The expected benefits for construction companies include a reduction in lost days and legal costs due to accidents.
The e-learning course will be developed by a specialist external consultancy. The materials for classroom- based training will be delivered by ABC Company's development team. All course materials will be piloted before they are used. ABC Company will deliver training to its customers and also hopes to sell the course materials to other training companies as part of their operational business. ABC Company will use their own sales and marketing departments to promote the courses.
The legislation requires construction companies to comply with the new legislation within two years. The course materials and trainers have to be accredited by a government agency before courses can be delivered. ABC Company is planning to deliver pilot courses within five months of starting the project.
The ABC Company standard development model for new courses recommends the following stages:
End of the Project scenario.
Additional Information:
The Chief Executive Officer (CEO) founded the company five years ago. Under her leadership, ABC Company has grown quickly into a successful training company. It delivers a range of accredited professional training.
The Finance Director is also a founder member of ABC Company and is responsible for authorizing budgets for the Operations and Development Teams. She authorizes all large contracts personally.
The Purchasing Manager reports to the Finance Director and is responsible for managing and monitoring supplier contracts.
The Operations Director is responsible for the delivery off all training and for the training development budget. His department organizes courses, venues and trainers. They work with the Product and the Sales teams to provide a comprehensive training schedule. ABC Company's IT manager reports to the Operations Director.
The Business Development Director has recently been appointed to identify new training needs and propose new products. She will work with the Operations. Director to ensure a cost-conscious approach and that appropriate development technologies are used for the health and safety course.
The Training Development Manager reports to the Business Development Director and is responsible for developing training materials and gaining accreditation, in accordance with the standard course development model. Course developers in his team have skills in a range of development technologies and are allocated to projects as needed.
The Training Delivery Manager, who reports to the Operations Director, is responsible for ensuring that internal and external trainers deliver ABC Company training courses to the required standard. He also checks course materials to ensure they are fit for purpose and of the required quality.
The Central Services Director has responsibility for corporate communications, facilities management and configuration management. He recently led a project to consolidate all company quality systems into one quality management system and set up a corporate quality department, now managed by the Corporate Quality Manager.
The Corporate Document Manager reports to the Central Services Director. She helped establish the company's document management system and now operates it across the business. She manages a team of administrators and contracts staff when workload is high.
The Sales Director joined ABC Company two months ago and is keen to establish himself by suggesting new markets for the courses and material. All account managers and the marketing team report to him.
They promote existing training courses to other training companies and existing customers.
End of the additional information.
ABC Company uses a standard development model to develop courses and uses PRINCE2 to manage these projects. The objectives from the Health and Safety Training Project have been documented in the business plan of ABC Company. This business plan has triggered this project. As a result, to save time, the executive has decided to simplify the 'starting up a project' process. The project mandate will be adapted and becomes the project brief.
Is this appropriate, and why?

  • A. No, because the project brief should be a statement which includes a fuller description of the project.
  • B. No, because capturing lessons from previous projects identify lessons to be applied to this project.
  • C. Yes, because the business outcomes are clear, the project brief can be a sample statement elaborating the mandate.
  • D. Yes, because the executive can initiate the project based on the project mandate by passing the
    'starting up a project' process.

Answer: A