NEW QUESTION # 37
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

  • A. First in first out (FIFO)
  • B. Simultaneous
  • C. Manual maintenance
  • D. 100% check

Answer: C,D


NEW QUESTION # 38
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing?
Note: There are 3 correct answers to this question.

  • A. Reduce run schedule quantities.
  • B. Update statistics for the Business Information Warehouse.
  • C. Create associated capacity requirements.
  • D. Post the goods receipt for the finished product.
  • E. Post production costs to the planned order.

Answer: A,C,E


NEW QUESTION # 39
What are the key features of using a low level code?
Note: There are 2 correct answers to this question.

  • A. To determine the priority of alternative components inside ATP
  • B. To determine the use of subitems inside material BOM (bill of material)
  • C. To determine how costs are rolled up by product costing
  • D. To determine the sequence in which materials are planned in MRP

Answer: C,D


NEW QUESTION # 40
You want to trigger inhouse production of a semifinished material before a sales order for the corresponding finished good is received.Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semifinished material?

  • A. Production by lot size (30)
  • B. Planning at assembly level (70)
  • C. Planning with final assembly (40)
  • D. Assembly processing with production orders (82)

Answer: B


NEW QUESTION # 41
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.

  • A. Reduced delivery times
  • B. Reduced times for final assembly
  • C. Option to forecast planning for production resources
  • D. Option to use maketoorder production

Answer: A,B


NEW QUESTION # 42
Why would you use phantom assemblies?
Note: There are 3 correct answers to this question.

  • A. To make the assignment of components easier
  • B. To simplify the structure of bills of material
  • C. To reduce the number of material masters
  • D. To increase the number of planning levels
  • E. To reduce the number of changes required in bills of material

Answer: A,B,E


NEW QUESTION # 43
How can you achieve a feasible production plan in case of capacity constraints?
Note: There are 3 correct answers to this question.

  • A. Reduce the planning time interval.
  • B. Determine a time period with available capacity on the planning board.
  • C. Execute an infinite production planning run for the critical resources.
  • D. Increase the capacity supply in a timephased interval.
  • E. Form optimum sequences to reduce setup times.

Answer: B,D,E


NEW QUESTION # 44
Which supply chain planning components can you find in SAP S/4HANA?
There are 2 correct answers to this question.

  • A. Supply Network Planning
  • B. Supply Chain Control Tower
  • C. Capacity Requirements Planning
  • D. Advanced Planning

Answer: C,D


NEW QUESTION # 45
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. What status does the BOM have?
  • B. Is the material type allowed in the BOM?
  • C. Which base unit of measure does the material have?
  • D. In which storage location is the BOM required?

Answer: A,B


NEW QUESTION # 46
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.

  • A. Planned orders (firmed)
  • B. Planned orders (unfirmed)
  • C. Production orders
  • D. ATP quantities

Answer: A,C


NEW QUESTION # 47
What generates capacity requirements in a process order?
Please choose the correct answer.

  • A. Phases
  • B. Operations
  • C. Resources
  • D. Activities

Answer: A


NEW QUESTION # 48
Your project uses process orders for the production of liquid chemicals.
What can you define to ensure that production flow only happens in suitable physically connected tanks?
Note: There are 2 correct answers to this question.

  • A. Resource hierarchy
  • B. Resource network
  • C. Resource selection
  • D. Resource matrix

Answer: B,C


NEW QUESTION # 49
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero the discontinuation date is in the past?

  • A. Back flushing
  • B. Production order release
  • C. Kanban
  • D. Material requirements planning

Answer: D


NEW QUESTION # 50
To trigger a goods receipt posting, which Kanban status do you have to set?
Please choose the correct answer.

  • A. Empty
  • B. Full
  • C. Wait
  • D. In use

Answer: B


NEW QUESTION # 51
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to identify overstock situations in the balance between the receipt the issue elements after the production planning run
  • B. An evaluation to identify material or capacity shortages in the billofmaterial structure after the production planning run
  • C. An evaluation that is ordered according to the network structure of all related products represents the coverage of issue elements with receipt elements stock
  • D. An evaluation that is ordered according to the billofmaterial structure of all related products represents the relationship between the receipt the issue elements

Answer: D


NEW QUESTION # 52
In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning.
What does this mean for the capacity requirements of a new order?

  • A. MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.
  • B. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.
  • C. MRP creates the capacity requirements without considering existing load on the work centers.
  • D. MRP creates the capacity requirements at the earliest possible time.

Answer: A


NEW QUESTION # 53
Which business processes are affected by settings in the order type dependent parameters?
Note: There are 2 correct answers to this question.

  • A. Define integration with cost accounting.
  • B. Schedule production orders.
  • C. Check material availability.
  • D. Select master data.

Answer: A,D


NEW QUESTION # 54
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.

  • A. Production order
  • B. Purchase order
  • C. Scheduling agreement schedule line
  • D. Planned order

Answer: C,D


NEW QUESTION # 55
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.

  • A. Planning mode > Bucket
  • B. Planning mode > Order priority
  • C. Scheduling control > Close gap
  • D. Scheduling control > Find slot

Answer: A,D


NEW QUESTION # 56
What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching?
Note: There are 2 correct answers to this question.

  • A. The Change Planning Direction indicator is set in the strategy profile.
  • B. The Finite Scheduling indicator is NOT set in the strategy profile.
  • C. The work center has several individual capacities.
  • D. Alternative work centers are fully occupied.

Answer: B,C


NEW QUESTION # 57
Which time elements are part of a routing operation?
Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Processing time
  • C. Pick time
  • D. Setup time
  • E. Float before production

Answer: A,B,D


NEW QUESTION # 58
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.

  • A. Order type determination
  • B. Planning selection
  • C. Actual cost calculation
  • D. Capacity requirements determination
  • E. Master data selection

Answer: A,D,E


NEW QUESTION # 59
What is a work center hierarchy?

  • A. A group of work centers in a parallel sequence that is used to split production quantities work on them in parallel
  • B. A group of work centers in a production line being used in sequence for production
  • C. A group of alternative work centers for production structured in hierarchy levels by priorities
  • D. A group of alternative work centers providing a cumulative available capacity for production

Answer: D


NEW QUESTION # 60
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
Note: There are 2 correct answers to this question.

  • A. Sequencing on multiactivity resources is automatically updated.
  • B. Scheduling of an operation takes place as close as possible to the desired date.
  • C. Changes are automatically implemented in the complete collective order.
  • D. Neighboring operations can be moved in both directions in order to create a slot.

Answer: B,C


NEW QUESTION # 61
......